Because the deployment of high-powered EV chargers continues to develop throughout the US, the difficulty of connecting them right into a facility’s current electrical system turns into a fancy drawback. Degree 3 EV chargers eat lots of energy, putting in 5 of them can simply add 2,000 amps to the present electrical service infrastructure. Modifying or changing the service entrance tools might be very pricey and restricted by area constraints.
The right way to Immediately Improve Your Facility’s Electrical Service with E-Bloc!
E-Bloc is a microgrid, a small-scale energy grid that may function independently or collaboratively with different small energy grids. It may well successfully combine varied sources of distributed era, particularly renewable power sources. As a pre-packaged service entrance switchgear it helps the fast deployment of high-speed charging (Degree 2 and Degree 3) in your premises with out altering the present electrical infrastructure. E-Bloc is put in open air between the utility transformer and the power’s current service tools. It straight feeds each the EV chargers and the power’s current load. No Modification is required to the constructing’s current service entrance tools. E-Bloc might be designed for varied forms of functions and is out there in each low and medium voltage configurations; 600 V (5,000 A) to 34.5 kV.
The Advantages of an E-Bloc Microgrid
In line with NREL, “A microgrid is a bunch of interconnected masses and distributed power sources that act as a single controllable entity with respect to the grid. It may well join and disconnect from the grid to function in grid-connected or island mode. Microgrids can enhance buyer reliability and resilience to grid disturbances.” E-Bloc might be geared up with the flexibility to assist varied distributed power sources (DERs); photo voltaic, power storage, engine turbines and others. E-Bloc’s configuration is versatile, supporting DER additions as your funds permits.
Scale back Utility Payments with Renewable Vitality Peak Shaving
Clients can make the most of renewable power peak shaving by way of photo voltaic and an on-board power storage system (ESS) to decrease power payments. E-Bloc’s ESS might be personalized to fulfill your power consumption wants with as much as 500kW of storage, residing on the identical skid because the switchgear. Pre-assembled off-site, E-Bloc minimizes disruption to your facility, permitting you to function your online business as typical. Gasoline cells or stand-by engine-generators can be added to additional improve resiliency. Your operation is rarely left at the hours of darkness with E-Bloc.
Managing and Optimizing your Microgrid
E-Bloc’s microgrid controls might be tailor-made to supply a primary degree of performance or full automated real-time controls (information acquisition, monitoring, management, and optimization). The E-Bloc controller manages a number of DERs to fulfill your power objectives, together with decreasing power prices, reducing carbon footprint (Internet Zero), higher electrical reliability or any variety of parameters.
Watch this video to get an summary of E-Bloc.
Obtain the one-page flyer.
Have extra questions? E mail e-blocsales1@pioneerpowersolutions.com.
e-Enhance Supplies Off-Grid Cellular EV Charging
Foresight into the Impending Infrastructure Hole
Pioneer Energy Options, E-Bloc and e-Enhance’s guardian firm had been working with utilities on energy distribution installations for many years. When Bipartisan Infrastructure Invoice grew to become legislation, Pioneer foresaw a delay in utilities conserving tempo with the EV demand, and e-Enhance was developed to bridge that infrastructure hole.
e-Enhance Reduces Stress on the Grid
The electrical automobile (EV) market is poised for an explosion in gross sales. McKinsey estimated that the variety of EVs within the U.S. would develop from lower than three million as we speak to greater than 48 million in 2030. However as of 2022, there have been solely 5,900 areas within the US with the quickest Degree 3 DCFC chargers obtainable to the general public in comparison with the 145K fuel stations with a number of pumps within the U.S. Furthermore, in its present trajectory, EV charging is aligned with grid infrastructure, which clusters round cities and dense populations.
e-Enhance is a useful resource that reduces the anticipated stress on the grid and might present charging alongside rural corridors in underserved or deprived communities—a key consideration in latest funding necessities.
Versatile, Non permanent or Everlasting Answer and $12.5B in Funding
With the Bipartisan Infrastructure Legislation’s $7.5B funding ($5B below NEVI, plus one other $2.5B concentrating on underserved areas) or the EPA’s $5B Clear Faculty Bus grants, figuring out vary, routes, best charging necessities and areas can take time to grasp. Visitors patterns can change resulting from a particular occasion—a climate associated catastrophe, lengthy vacation weekends, and different unanticipated anomalies. Beneath these circumstances, e-Enhance might be utilized in momentary areas, relocated, and even present backup energy as wanted.
Meet Funding Deadlines and 97% Uptime Necessities
Beneath each funding situations, infrastructure must be totally operational by particular dates. Nonetheless, it typically takes two years to convey enough energy, full electrical allowing, building, and set up at a website. e-Enhance’s flexibility solves this dilemma with:
A Greener Gasoline At this time
Furthermore, e-Enhance decreases the reliance of gas sources that produce vital quantities of GHG emissions. Propane is an permitted clear gas below the Clear Air Act since 1990. It’s an permitted Various Gasoline to be used alongside the Federal Freeway Administration’s Various Gasoline Corridors (AFCs), alongside which the Nationwide Electrical Car Infrastructure’s $5B in funding can be utilized. It emits considerably much less GHG than energy from the grid, diesel, or gasoline. Its storage flexibility means delicate habitats stay undisturbed, no pipelines or high-voltage line installations are wanted, and it isn’t reactive with the air, and subsequently doesn’t hurt the soil, ingesting water or marine ecosystems. e-Enhance can make the most of renewable Propane (rLPG), commercially obtainable as we speak and along with renewable DME, supplies a future-proofed design and pathway to net-zero.
Forestall Stranded Property
e-Enhance models are serviced by Pioneer’s Essential Energy Group, which has been servicing energy era property for 3 a long time with a nationwide community. In the end, e-Enhance supplies the operational assist that stop stranded property, one other key consideration below NEVI funding.
Drinks on Us!
Attending ACTexpo 2023 on the Anaheim Conference Heart? Be part of us in our hospitality suite on the Clarion Resort Anaheim Resort, Tues, Might 2nd and Wed, Might 3rd, from 4:30-7:00pm.
Have questions on e-Enhance? Or need to get learn our use circumstances? Go to our web site https://pioneer-emobility.com/ or ship us an e-mail at information@pioneer-emobility.com.
Pioneer Energy Options, Inc.
Pioneer Energy Options, Inc. (Nasdaq: PPSI) is a frontrunner within the design, manufacture, service and integration {of electrical} energy programs, distributed power sources, energy era tools and cell electrical automobile (“EV”) charging options.
To be taught extra about Pioneer, please go to our web site at www.pioneerpowersolutions.com.
Sponsored by Pioneer Energy Options.